2008-2009 PT Data Consult. All rights reserved.
INDONESIAN COMMERCIAL NEWSLETTER
MARCH 2009
List of Contents
COMPANY PROFILE : PT. SUCACO TBK 29
- Backgrounds 29
- Cable industry becomes a locomotive 29
- Marketing 30
- Standardization of Industry 30
- Subsidiaries 31
- Financial performance 32
INDUSTRY : CABLE BASIC MATERIAL INDUSTRY 34
- Copper cathode 34
- Copper Wire Rod 35
- Copper wires 36
- Aluminum ingot 36
- Aluminum rod and aluminum wire 39
- Conclusion 39
ENERGY :
SECOND PHASE OF ELECTRICITY CRASH PROGRAM AND DEVELOPMENT OF TRANSMISSION AND DISTRIBUTION NETWORKS 48
- Backgrounds 48
- Second Phase of Power Plant Crash Program 49
- Development of transmission networks 55
- Transmission Development Projects 55
- Large transmission and distribution systems still needed 57
- Fiscal Stimulus in electricity sector 58
FINANCE : PLN TO ISSUE BOND TO FINANCE SECOND PHASE OF PROGRAM TO BUILD 10,000 MW POWER PLANTS 65
- Backgrounds 65
- Second Crash Program to cost US$17.3 billion 66
- PLN's bonds valued at Rp1.5 trillion 67
- Financial performance 68
- Financing by state banks 68
- PLN's bonds bought by local investors 69
ECONOMICS NEWS IN BRIEF:
- Govt offers 8 infrastructure projects valued at Rp4.4 trillion 72
- Investment in textile industry feared to fall on shrinking orders 72
- Telecom and informatics industry asked to have higher local content 72
- Indonesia to use more organic fertilizers for food crops 73
- Government maintains zero % export tax on CPO 73
APPENDICES:
- Directory of Banking companies in Indonesia 74
ECONOMIC INDICATOR:
- Economic Indicators 76
- Export and import 77
- Gross Domestic Product 78
- Oil Price and Foreign Exchange 79
- The Indonesian Economic Trends 80
INDONESIAN COMMERCIAL NEWSLETTER (ICN)